Overview
We are not only committed to provide the best possible services in the field, but also to be completely transparent in everything we do. On this page you can now see a list of completed orders.
News
Overview of important events and selected jobs.
April 14, 2026
Grinder
dismantling
March 24, 2026
Machine
dismantling
March 11, 2026
Small
locksmithing
February 19, 2026
Moving
switchboard
February 4, 2026
Container
loading
January 22, 2026
Container
loading
January 7, 2026
Furnace
repair
January 3, 2026
Switchboards
moving
December 11, 2025
Moving
the winder
December 1, 2025
Machine
moving
November 29, 2025
Furnace
moving
November 10, 2025
Container
loading
November 8, 2025
Vogel machine
moving
October 21, 2025
Safety barriers
installation
October 10, 2025
Airducts
unloading
September 25, 2025
Container
unloading
September 23, 2025
Switchboards
moving
September 10, 2025
Container
loading
August 28, 2025
Air extractor
manufacturing
August 19, 2025
Vice stands
manufacturing
August 15, 2025
Screens
production
August 5, 2025
Moving
machinery equipment
July 21, 2025
Switchboards
moving
July 9, 2025
Container
unloading
June 27, 2025
Shelves
assembly
June 17, 2025
Production and installation
of the platform
June 4, 2025
Stands
manufacturing
May 24, 2025
Trolley
production
May 16, 2025
Production and installation
of stairs
May 7, 2025
Other
locksmithing works
April 29, 2025
Small
locksmithing work
April 9, 2025
Anchoring
the container
March 26, 2025
Shelf
adjustment
March 24, 2025
Moving
machine
March 13, 2025
Moving
switchboars
March 5, 2025
Machine
anchoring
February 25, 2025
Relocating
frames
February 20, 2025
Container
loading
February 12, 2025
Pressure vessel
installation
January 29, 2025
Small
locksmithing
January 16, 2025
Roller track
dismnatling
January 7, 2025
Switchboards
moving
December 18, prosince 2024
Switchboards
unloading
December 12, 2024
Skid
unloading
December 4, 2024
Container
placing
November 28, 2024
Exhaust system
installation
November 18, 2024
Machine
moving
November 6, 2024
Grinder
installation
October 24, 2024. října 2024
Unloading
frames
October 16, 2024
Vogel machine
moving
October 8, 2024
Transformer
moving
October 3, 2024
Switchboards
moving
September 27, 2024
Connecting
machine
September 17, 2024
Moving CNC
milling machine
September 6, 2024
Coil holder
production
August 29, 2024
Installation of
ventilation equipment
August 23, 2024
Connecting
containers
August 13, 2024
Production of
a vertical holder
July 30, 2024
Lathe
moving
July 17, 2024
Container
loading
July 3, 2024
Stand
manifacturing
June 18, 2024
Container
docking
June 9, 2024
Mobile table
manufacturing
June 3, 2024
Switchboard
moving
May 30, 2024
Frame
transportation
May 22, 2024
Převoz
rámů
May 16, 2024
Bulletin board
production and assembly
May 7, 2024
Industrial furnace
repair
May 1, 2024
Crain
repair
April 24, 2024
Container
loading
April 16, 2024
Showroom
instalation
April 10, 2024
Connecting
the press
April 2, 2024
Production and installation of
shelf leg covers
March 28, 2024
Machine
moving
March 20, 2024
Lathe
moving
March 13, 2024
Milling machine
moving
March 6, 2024
Container
unloading
February 20, 2024
Disconnecting
device
February 9, 2024
Unplugging
machine
February 1, 2024
Machine
assembly
January 24, 2024
Container
loading
January 11, 2024
Test machime
installation
January 4, 2024
Electrical connection for
milling machine
Decmeber 27, 2023
Machine
dismantling
Decmeber 14, 2023
Milling machinee
dismantling
December 6, 2023
Aircondition container
modification
November 21, 2023
Expansion of ecological
operation
November 14, 2023
Minor locksmith
work
November 9, 2023
Furnace hydraulics
installation
October 25, 2023
Showroom switchobards
installation
October 18, 2023
Shelf
repair
October 11, 2023
Moving
switchboards
September 28, 2023
Loading
container
September 12, 2023
Moving
Vogel
September 7, 2023
Furnace undercoat
production
August 31, 2023
Furnace rails
adjustments
August 16, 2023
Positioning
transformers
August 2, 2023
Unloading
transforers
July 26, 2023
Moving
switchboards
July 18, 2023
Dismantling of
shelves
July 12, 2023
Dismantling of
switchboards
July 6, 2023
Container
dispatch
June 27, 2023
Loading
packed skids
June 21, 2023
Dispatching
more switchboards
June 15, 2023
Container
dispatch
June 6, 2023
Switchboard
dispatch
May 25, 2023
Moving
switchboards
May 16, 2023
Moving
skids
May 11, 2023
Offloading large
container
April 20, 2023
Loading
containers
April 12, 2023
Shelves
repair
April 4, 2023
Moving
switchboards
March 27, 2023
Extending
service availability
March 23, 2023
Moving
machine
March 15, 2023
Cardex
transport
March 1, 2023
Moving
transformer
February 22, 2023
Furnace door
control adjustment
February 14, 2023
Moving
container
February 2, 2023
Loading
container
January 25, 2023
Moving
machine
January 11, 2023
Loading
container
December 14, 2022
Moving
switchboard cabinet
November 29, 2022
Cart
production
November 16, 2022
Container
adjustment
November 3, 2022
Building
of an anti-niose cover
October 27, 2022
Settling
and anchoring the drill
October 19, 2022
Loading
container
October 11, 2022
Settling
container
October 5, 2022
Transport
of switchboard frames
September 28, 2022
Moving
a lathe
September 20, 2022
Moving
switchboards
September 14, 2022
Installation
of transformers
September 7, 2022
Moving
mixer
August 24, 2022
Moving
vacuum furnace
August 16, 2022
Support
structure modification
August 10, 2022
Placing
a switchboard
August 3, 2022
Modification
of railings
July 26, 2022
Production
of a fire ladder
July 13, 2022
Moving
the robot path
July 5, 2022
Moving
a drill
June 21, 2022
Moving
a press
June 7, 2022
Moving
hall container
June 1, 2022
Moving
furnaces
March 24, 2022
Moving
robot
March 18, 2022
Installation
of shelves
March 10, 2022
Moving
switchboards
March 4, 2022
Connecting
furnaces
April 27, 2022
Moving
a transformer
April 20, 2022
Moving
switchboards
April 12, 2022
Unloading
heavy container
April 7, 2022
Heavy container
loading
March 29, 2022
Vacuum furnace
disassembly
March 18, 2022
Moving
Sheetmaster
March 8, 2022
Moving more
switchboards (showroom)
March 2, 2022
Moving
Trumatic
February 21, 2022
Switchboards
assembly
February 14, 2022
Unloading
substations
February 03, 2022
Unloading
large container
January 28, 2022
Moving
Trumatic
January 10, 2022
Installation of
Neogear switchboard
December 21, 2021
Loading of
transformers
December 15, 2021
Moving switchboard
base frames
December 2, 2021
Crane
assembly
November 24, 2021
Moving
transforer
November 11, 2021
Moving
switchboards (showroom)
October 20, 2021
Dismantling
of shelves
October 6, 2021
Moving
press
September 13, 2021
Production of stainless
steel platform
September 2, 2021
Moving
transformer
August 30, 2021
Moving automated
welding machine
August 18, 2021
Moving
casting equipment
August 5, 2021
Moving milling
machine and lathe
July 27, 2021
Anchoring automated
welding machine
July 17, 2021
Production and installation
of shelve bumpers
June 23, 2021
Air supply
for scissor lift
June 10, 2021
Power supply
for scissor lift
March 21, 2021
Moving the Vogel
casting machine
March 5, 2021
Loading container
with switchboards
April 29, 2021
Fire door
dismantling
April 21, 2021
Air extractor
disassembly
April 8, 2021
Rocker rack
manufacturing
March 22, 2021
Disassembly and assembly
of a crane for ABB
March 3, 2021
New welder
OMICRON TIG 315LP
February 19, 2021
New service platform
IMER IM 10090
February 11, 2021
Production and installation
of service platform
January 27, 2021
Production and installation
of protective mesh
January 6, 2021
Crane disassembly
for ABB
December 8, 2020
Wall installation
for ABB
December 4, 2020
Moving press
for ABB
November 20, 2020
Production and installation
of service platform
November 2, 2020
Moving machine
VOGEL for ABB
October 28, 2020
Extending
service availability
October 2, 2020
Switchboard
assembly for ABB
September 21, 2020
Moving
printing press
September 11, 2020
Loading
and moving switchboards
August 20, 2020
Production and assembly
of a wall for ABB
July 7, 2020
Production of
special pallets
June 9, 2020
Transformer seating
for ABB
April 22, 2020
Shelf repair
for ABB
March 30, 2020
COVID-19
Overal slowdown
March 8, 2020
Moving skids
for ABB
February 20, 2020
Container loading
for ABB
February 20, 2020
Roof mounting
on a container
January 13, 2020
Crane disassembly
for ABB
December 4, 2019
Crane disassembly and assembly
for ABB
November 27, 2019
Moving of mobile substations
for ABB
August 23, 2019
Moving, wiring and balancing of
the SV18 lathe for IVEP
June 12, 2019
Installation of pipelines and
power line support for Hübers
May 15, 2019
Production of sensor trolleys
for ABB
January 16, 2019
Repair of lathe SU 40
for HKD metalworks
January 10, 2019
Moving Paper Cutter
for Arjowiggins
December 6, 2018
Repair of eccentric press LEU 100
for Čermák Springs
November 29, 2018
Moving Trumpf TruBend 5230
bending machine
November 15, 2018
Production and assembly
of a servicing platform for ABB
November 1, 2018
Moving a milling cutter
for the local military unit
October 25, 2018
Installation of guiding
equipment for ABB
October 18, 2018
Outside fencing
of the generator for ABB
October 11, 2018
Handling of ABB containers and their seating (up to 37 tons, 18m long)
September 7, 2018
Repair of
Trumpf TruMatic 5000R
August 15, 2018
Website improvements, individual services now have subpages
August 15, 2018
We are now showing job vacancies (only on CZ part of our web)
April 10 2018
Our website is now under HTTPS protocol, safer and secure
December 15, 2017
We celebrate the 20th anniversary of our existence on the market
July 22, 2017
Improved website, let's hope you'll like a lighter and responsive deign
Quick contact
Are you interested in our offer? Do you want to order a service or would you just like to get more information? Drop us a line or call us! You can find more contacts and bank details here.
IČO: 25512081 | DIČ: CZ25512081